Let’s look at the base mounting.We’ll start by attaching the two crossarms to the rodsAnd then install it over here.And then we put this set screw.2 screws on each side.


After finishing.And then we put in the vertical arm



And then we can put this together.


Same thing with the plate here.And then we set it up.

After loading.And this is what anchors our mainframe.We don’t want to fix this screw in the middle of this plate.And then just fix the two sides.

And then this nut in the middle we’re going to secure this bracket.A stand for the touch screen.’m gonna fix this.

And then we take this.There are two holes under the main engine.Secure the two holes of the plate.And then the screw locks it.There are two holes above and below.There are two holes on this side.There are two more holes down there.

And then we put this under the board.Then don’t lock up.Face up.Set the holes and put the screws back up.Set the holes and put the screws back up.Lock the screws, too.And then we lock it in place.

This one must be gasketed.Otherwise it won’t fit.We push the nut in.Get the holes right.We’ll put it back on.Our screws only fit these four in the middle.You don’t have to put it on the outside.The one on the outside is photoelectric.

Install screen.

Power cord.


Optical fiber bracket.We’ll just put in a hole.It can fit in this position

It can also be installed in this positionIf our production line goes from right to left.Product from right to left.We can put it in this position.Remove this screw.And then put it on.

Or if we go from left to right.From left to right.We can fit it right here.Put it right here.

After loading.We can install the encoder here.The encoder is easy to install.And then we have a four-hole on this side.We have a four-hole here.Then put it on.And then the other end will be attached to the cable.Install on the cable.